  • Kuwait Doha Link Pile Decommissioinimg
    kEY FIGURES
    Contractor GS E&C
    Project Scope Decommissioning Project for Prototype Piles (Dia. 1800mm) for Doha Link Bridge between Shuwaikh Port and Doha Peninsula
    Subcontractor UMI Corporation
    Project Period 2016.12 ~ Present
  • "NESA R3" Inspection & Remaining Oil Recovery
    kEY FIGURES
    Client MECA(Ministry of Environment and Climate Affairs, Oman)
    Project Scope Pre-salvage Survey & Remaining Oil Recovery
    - Hydrographic Survey
    - Oil Target Point Searching
    - Bitumen Condition survey
    - Seabed Condition Survey
    - Remaining Oil Recovery
    Project Location 2.6km North East from the Port Sultan Qaboos, Oman(Latitude, 23°39’ 04.10” N, Longitude, 58°34’ 41.92” E)
    Project Period 2013.09 ~ 2014.02
  • "Zhou Hang 2" Dry Salvage & Bunker Oil Removal
    kEY FIGURES
    Client PICC (PEOPLE’S INSURANCE COMPANY OF CHINA)
    Project Scope Bunker Oil Removal
    - Water Tightening
    - Deballasting
    - Refloating & Towing to the Anchorage
    Project Location SangjinPort of Ulsan (35-28.784N, 129-25.251E)
    Project Period 2013.12
  • "Pacific Carrier" Bow Section Salvage & Towing 67,000DWT Bulk Carrier
    kEY FIGURES
    Client Nippon Salvage
    Project Scope - Adjustment of ship’s ballast tank for salvaging a Stranded Ship - Drain the Stranded Ship’s ballast water with Cargo using several FRAMO Pump - With salvaging a Stranded Ship and tow to the target position
    Project Location Sachon, South Korea
    Project Period 2012.08
  • "Kenos Athena" Chemical Removal & Salvage Project
    kEY FIGURES
    Client Korea Shipping Association
    Project Scope Chemical(7,000ton) / Oil(150ton) Removal & Salvage
    Project Location Guangzhou, China
    Project Period 2012.04 ~ 2012.09
  • Aircraft & Black Box Recovery Project
    kEY FIGURES
    Client KT Submarine
    Project Scope Aircraft & Black Box Recovery
    Project Location Jeju Island, Korea
    Project Period 2011. 9 ~ 2011. 11