Offshore TIE

본문 바로가기

HOME / Track Record / Offshore TIE

Offshore TIE
  • Power Plant Intake & Diffuser Lines
    kEY FIGURES
    Client UTE (National Administration of Power Plants and Electrical Transmissions, Uruguay)
    Project Scope EPIC of HDPE intake and diffuser pipelines
    Contractor HYUNDAI E&C
    Project Period 1 2015.01 ~ present
  • Chlorination Pipeline Installation
    kEY FIGURES
    Client OOCEP(Oman Oil Company Exploration & Production) / Hyundai Engineering
    Project Scope Chlorination Pipeline Installation from Seawater Intake Basin to Seawater Intake Head
    Project Location Musandam, Oman
    Project Period 1 2015.06 ~ 2015.07
  • 350,000DWT FSU Installation & SURF Engineering
    kEY FIGURES
    Client STX OFFSHORE/OCEANUS
    Project Scope - Hand over from China to Arabian Gulf
    - Eight(8) Mooring Chains Connection to FSU Turret and FSU Positioning
    - SURF Engineering & FSU Mooring Centerizing
    Project Location Arabian Gulf
    Project Period 1 2012. 3 ~ 2012. 9
    Project Period 2 2013. 5 ~ 2013.12
  • Musandam Gas Plant Project, Oman(Pipeline & SPM Installation)
    kEY FIGURES
    Client OOCEP(Oman Oil Company Exploration & Production)
    Contractor Hyundai Engineering
    Project Scope Marine Facilities Installation for Musandam Gas Plant Project
    -Diving Services for Six(6) Pipeline Pulling (3ea-40inch/1ea-30inch/2ea-12inch)
    -SPM(250,000 DWT) & PLEM Installation
    Project Period 2012. 11 ~ 2014.10
  • Shanghai LNG Pipeline & Terminal Project, China(Offshore Diving Service)
    kEY FIGURES
    Client Shanghai LNG Company/Hyundai Heavy Industries
    Project Scope Offshore Diving Service for Shanghai LNG Pipeline Installation(30”, 35.6km)
    Project Location Shanghai, China
    Project Period 2008.08 ~ 2008.12
  • SK Crude Oil Terminal No.2,3 Replacement Project
    kEY FIGURES
    Client SK Energy & Hyundai Heavy Industry
    Project Scope Diving Services for Pipe-laying & PLEM Installation for Oil Tanker Terminal
    - Pipeline : No. 2(5.5Km) 42" Pipeline, No. 3(4.5Km) 42" Pipeline
    - PLEM: No.2(48”) & No. 3(48”)
    Project Location Ulsan, Korea
    Project Period 2008.03 ~ 2008.08
  • VASAI East Development Project, India(Subsea Pipeline Engineering)
    kEY FIGURES
    Client ONGC / Samsung Heavy Industries
    Project Scope VASAI Pipeline Engineering (10"&20" Riser Spool Piece Tie In)
    Project Location Mumbia, India
    Project Period 2009.02 ~ 2009.05